Lead the development of detailed project schedules along with project teams’ input
Collect project progress and updating project status
Performing impact analysis for potential delays and changes
Work with the project management and field teams to help set project goals and analyze the status of the project
Analyze the schedules to determine duration and logic issues
Ability to manage schedules for multiple projects and/or more complex projects, larger in size
Provide guidance to less experienced members of the scheduling team
Perform other duties as assigned
Travel may be necessary depending on the project needs and location
Requirements
Bachelors degree in Construction Management, Engineering, or related field is preferred
Minimum 3 years of experience in complex construction (Heavy Commercial, Data Centers, Industrial, Power Generation, Specialty Contractors, Heavy Civil)
Knowledge of critical path method of scheduling
Experience using CPM Primavera P6 scheduling software
Experience with ProCore, Bluebeam, Navisworks, REVIT preferred
Familiarity with claims prevention and analysis techniques strongly preferred
Ability to conduct constructability reviews for varying construction method/techniques during design or construction
Construction Schedule Manager, P6 Schedules at Mullins Mechanical | JobVerse