Lorven Technologies Inc. is seeking an IPTEL CFX Product Deployment and Integration Engineer for a contract role. The engineer will be responsible for the deployment and integration of Nokia CFX node services, including low-level design and preparation of method of procedures, while ensuring proper documentation and support during maintenance windows.
Responsibilities:
- Deployment/Integration role (Professional Services) – Nokia CFX node – supporting 4G/5G xCSCF network node services
- Low Level Design - CIQ, DNP, TPD (Common and DUSpec), Plato
- Does the deployment and integration, ATP, new sw release, feature testing and clear SOW
- MoP (Method of Procedure) – Preparation
- Works closely with IMS SA to verify and implement overall solution
- Deployment based upon specific MOPs (created during FOA/FSA) or greenfield deployment
- Limited time engagement with clear scope as defined in SOW
- Trains with FOA/FSA team in lab prior to Production execution
- Critical emphasis on proper documentation or production grade capacity, availability, stability and doing it right the first time
- Often required to work maintenance windows in support of introduction of new NFs
- MOP Authoring IMS/SDM/5G
- Second Testing of MOP’s for IMS/SDM/5G
- Lab Maintenance
- Troubleshooting issues in Lab and Production
Requirements:
- Deployment/Integration role (Professional Services) – Nokia CFX node – supporting 4G/5G xCSCF network node services
- Low Level Design - CIQ, DNP, TPD (Common and DUSpec), Plato
- Does the deployment and integration, ATP, new sw release, feature testing and clear SOW
- MoP (Method of Procedure) – Preparation
- Works closely with IMS SA to verify and implement overall solution
- Deployment based upon specific MOPs (created during FOA/FSA) or greenfield deployment
- Limited time engagement with clear scope as defined in SOW
- Trains with FOA/FSA team in lab prior to Production execution
- Critical emphasis on proper documentation or production grade capacity, availability, stability and doing it right the first time
- Often required to work maintenance windows in support of introduction of new NFs
- MOP Authoring IMS/SDM/5G
- Second Testing of MOP's for IMS/SDM/5G
- Lab Maintenance
- Troubleshooting issues in Lab and Production