Description
*Due to being an in-plant position, the below referenced job duties have been provided by the client:
Role Summary:
The Capital Project Construction Scheduler develops, maintains, and analyzes project schedules for large scale capital construction programs. This role ensures that planning, sequencing, and progress tracking support on time, on budget delivery while giving project leaders clear visibility into risks, constraints, and opportunities.
Key Responsibilities:
•Develop and maintain project schedules using Primavera P6 covering engineering, procurement, construction, commissioning, and closeout phases.
•Create detailed work breakdown structures (WBS) and activity logic that accurately reflect project scope, sequencing, and resource needs.
•Monitor schedule performance, track progress, and update activities based on field reports, contractor input, and project team feedback.
•Analyze schedule impacts related to design changes, procurement delays, field conditions, and contractor performance.
•Prepare schedule reports and dashboards including critical path analysis, look ahead schedules, variance reports, and recovery plans.
•Collaborate with project managers, construction managers, estimators, and contractors to align schedule expectations and resolve conflicts.
•Integrate cost and schedule data with project controls teams to support forecasting, earned value analysis, and performance measurement.
•Ensure compliance with organizational scheduling standards, procedures, and reporting requirements.
•Participate in planning meetings, progress reviews, and site visits to validate schedule assumptions and field conditions.
•Produce resource curves for projecting manpower (monthly).
•Maintain “Construction Progress Reports” tracking budgeted KMQ’s vs installed KMQ’s.
•Perform other job-related duties as assigned.
Required Qualifications:
•Experience developing and managing schedules for capital construction projects (industrial, infrastructure, energy, manufacturing, or similar).
•Proficiency with Primavera P6.
•Proficiency with Microsoft Excel, Word, and PowerPoint.
•Strong understanding of construction sequencing, field operations, and project delivery methods.
•Ability to perform critical path method (CPM) scheduling and interpret schedule analytics.
•Experience working with engineering, procurement, and construction (EPC) workflows.
•Strong communication skills for presenting schedule information to technical and non technical stakeholders.
•Ability to work in a fast paced environment with multiple priorities and deadlines.
Preferred Qualifications:
•Strong Primavera P6 knowledge (certificate, professional, advanced)
•10+ years of experience scheduling Capital Projects in an industrial setting
•Familiarity with large capital projects ($500M–$150MM+).
•Knowledge of interpreting contractor schedules for incorporating into P6
Success Profile:
A successful scheduler in this role is analytical, detail oriented, and proactive. They anticipate risks before they materialize, communicate clearly with field and office teams, and maintain schedules that serve as reliable tools for decision making.
#LI-RECON
Requirements
ReCon’s Job Description & Requirements:
Education and Experience:
High School Diploma or Equivalent (GED), with additional specialized training or college course work.
Physical Requirements: