Asheville, North Carolina, United States of America
Full Time
1 week ago
$210,000 - $240,000 USD
Visa Sponsor
Key skills
CypressPythonRTOSLeadershipCommunication
About this role
Role Overview
Screen and qualify potential points of interconnection (POIs) across CCR's national portfolio based on cost, timing, constraint exposure, and upgrade risk — for solar, storage, and co-located large load sites.
Conduct steady-state power flow analysis using TARA, PSS/E, PowerWorld, or equivalent tools to identify attractive injection capacity and transfer capacity for load.
Forecast thermal overloads, estimated interconnection costs, and queue timing for projects across PJM, MISO, ERCOT, WECC, and other markets.
Develop automated tools and workflows to increase the frequency, speed, and accuracy of wide-area and injection screening.
Develop physical interconnection configuration designs for co-located generation and large load facilities to optimize speed-to-power and project sizing.
Review and independently replicate ISO/RTO interconnection study results to validate assumptions, identify errors, and challenge upgrade cost allocations where appropriate.
Identify queue attrition potential that may eliminate or reduce network upgrade requirements, and advise project teams accordingly.
Play a defining role in shaping CCR's interconnection strategy across ISOs/RTOs by deeply understanding evolving regulatory frameworks and translating them into project configuration and queue positioning recommendations.
Support project optimization strategies including surplus interconnection, project resizing, and alternative interconnection configurations.
Develop commercialization strategies for co-located large load and generation facilities.
Support GIA negotiations by providing technical context and strategic recommendations to project managers and commercial teams.
Advise senior leadership on the implications of FERC orders, market rule changes, and long-term transmission expansion trends.
Serve as CCR's technical representative in discussions with ISOs, RTOs, and utilities.
Partner with Grid Integration Project Managers to track and shape tariff updates, interconnection process reforms, and performance requirement changes in alignment with CCR's commercial priorities.
Act as CCR's internal subject matter expert on transmission planning and interconnection engineering.
Partner with development, finance, commercial, and operations teams to define and execute CCR's interconnection value proposition for large load customers.
Build and maintain internal systems, databases, and workflows that improve transparency, efficiency, and institutional knowledge across the Grid Integration team.
Requirements
BS in Electrical Engineering or closely related engineering discipline from an accredited university required.
8+ years of transmission planning experience as a utility planner, generation developer, or consulting engineer.
Prior experience working across multiple ISOs and utilities with detailed knowledge of interconnection study methodologies.
Proficiency with power flow software (PSS/E, PowerWorld, TARA, or equivalent).
Python or other programming/scripting experience preferred.
Strong organizational skills with the ability to manage and prioritize across multiple simultaneous workstreams.
Excellent written and verbal communication skills, with the ability to convey technical findings clearly to non-technical audiences.
Embrace and live by the mission and values of Cypress Creek Renewables.
Tech Stack
Cypress
Python
RTOS
Benefits
15 days of Paid Time Off, accrual up to 20 days, 11 observed holidays.
401(k) Match
Comprehensive package including medical, dental, vision and health insurance
Wellness stipend, family planning stipend, and generous parental leave