Verify quantities of work in the field; this includes both what was completed and what is projected
Update action log/ RFI log etc.
Safety Observation/ Inspection Quality Inspection
Conduct and/or participate in the weekly update meeting with project team and distribute Meeting Minutes to team
Participate in the contractors weekly safety meetings with project team
Complete Weekly Report
Schedule Review
Site Meeting Minutes
Ensure Environmental Inspections are done (such as 3 rd party SWPPP and EFORM-IUSA.012)
Notification to substations/T-Line ROW/Subway System; whatever is applicable for the project
Daily AGRN Job Briefing
Copy contractor job briefing
Perimeter check of the station at the beginning of the shift and at the end of the shift
Call in any abnormalities to the ECC/dispatch
UI to check annunciator
UI-check annunciator prior to beginning work for the day
Look for physical and environmental issues
Tale quality photos of the days work, label with the same date and have it uploaded into PW; include in daily report
Work with CM or DC to ensure pictures are uploaded to PW as part of weekly report
Work with project contractors to ensure emergency access is known and easily identifiable in case of an incident on an off-road work site or remote location and that all plans have been reviewed and discussed if a remote incident occurs
Safety observations/inspections as needed
Conduct EHS orientation sessions
Escort any site Visitors and check on them
ITPs
Inspection test plans
RFIs DCN, FCN Design change notification and Field change notification
PDM, NDM
Proposed Design Modification and notice of design modification
Non-Conformance
Should be tracked by FCM and make sure it is uploaded to PW